Hendrik Swart
Working as Site manager on projects in South Africa
1. Sasol Secunda – Shondoni Overland Conveyor project
2. Xstrata Steelpoort Lion Phase 2
3. Afplats Leeuwkop Main Shaft Headgear (DRA)
4. Styldrift Royal Bafokeng Platinum (TWP)
5. Nchwaning 3 Beneficiation Plant (TWP)
6. Waterval Smelters Rustenburg (G & H)
7. Impala Minpro Flash Dryer (R S V)
8. Lion Project Phase 1 – Steelpoort (Xstrata)
9. Highveld Steel – Witbank (Work with URM)
10. TSB Molatec – Malalane
11. Assmang Manganese – Cato Ridge
Show profile Hide profile1. Sasol Secunda – Shondoni Overland Conveyor project (Sandvik)
1 September 2014 to 15 July 2016
Appointed as Site Manager under the OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 – 16.2.
Maximum employees on site – 160
Appointed as Health and Safety committee chair person. Control the pity cash on site and do month end reports on spending.
Interview employees for positions and to be part of the team to complete the overland conveyor project from Shondoni to Sasol Secunda (24 kilometer) longest tail driven curved conveyor in the Southern hemisphere. Appoint Supervisors under the MHSA and the OHSA. Appoint operators of moving machines under the OHSA – Driven machine regulation. Get nominees for Safety reps from all employees and have an election and done the appointments after the election. See that all employees that is appointed have the correct training and all operators have a valid license to operate. Compiling of a project plan on MS Projects for the complete project.
Compile method statement for the erection of all structures, conveyors and installation of mechanical equipment as per erection drawings, part by mark list and bolt list.
Help with the compiling of Risk Assessments for all tasks. With the help of the Rigger team compiling rigging studies for all heavy and complex lifts.
Compiling of daily reports on work performed the previous day. Month end reports of all work done. Doing PTO's on employees to track their performance on specific tasks. Be part of the cold and hot commissioning team to complete the project.
2. Xstrata Steelpoort Lion Phase 2 (Glencore Xstrata)
28 May 2012 – 30 August 2014
Appointed as Site Manager under the OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 – 16.2.
Appointed as Health and Safety committee chair person. Approve spending of pity cash. Approve orders for all PPE to be order for site as required.
Maximum employees on site – 185
Interview employees for positions and to be part of the team to complete the project on time and in budget. Appoint Supervisors under the OHSA. Appoint operators of moving machines under the OHSA – Driven machine regulation. Get nominees for Safety reps from all employees and have an election and done the appointments after the election. See that all employees that is appointed have the correct training and all operators have a valid license to operate. Compiling of a level 4 project plan on MS Projects for the complete project.
Compile method statement for the erection of all structures, conveyors and installation of mechanical equipment as per erection drawings, part by mark list and bolt list.
Help with the compiling of Risk Assessments for all tasks. With the help of the Rigger team compiling rigging studies for all heavy and complex lifts.
Compiling of daily reports on work performed the previous day. Month end reports of all work done. Be part of the cold and hot commissioning team to complete the project. Achieved 8 000 000 LTI free hours.
1. Sasol Secunda – Shondoni Overland Conveyor project (Sandvik)
1 September 2014 to 15 July 2016
Appointed as Site Manager under the OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 – 16.2.
Maximum employees on site – 160
Appointed as Health and Safety committee chair person. Control the pity cash on site and do month end reports on spending.
Interview employees for positions and to be part of the team to complete the overland conveyor project from Shondoni to Sasol Secunda (24 kilometer) longest tail driven curved conveyor in the Southern hemisphere. Appoint Supervisors under the MHSA and the OHSA. Appoint operators of moving machines under the OHSA – Driven machine regulation. Get nominees for Safety reps from all employees and have an election and done the appointments after the election. See that all employees that is appointed have the correct training and all operators have a valid license to operate. Compiling of a project plan on MS Projects for the complete project.
Compile method statement for the erection of all structures, conveyors and installation of mechanical equipment as per erection drawings, part by mark list and bolt list.
Help with the compiling of Risk Assessments for all tasks. With the help of the Rigger team compiling rigging studies for all heavy and complex lifts.
Compiling of daily reports on work performed the previous day. Month end reports of all work done. Doing PTO's on employees to track their performance on specific tasks. Be part of the cold and hot commissioning team to complete the project.
2. Xstrata Steelpoort Lion Phase 2 (Glencore Xstrata)
28 May 2012 – 30 August 2014
Appointed as Site Manager under the OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 – 16.2.
Appointed as Health and Safety committee chair person. Approve spending of pity cash. Approve orders for all PPE to be order for site as required.
Maximum employees on site – 185
Interview employees for positions and to be part of the team to complete the project on time and in budget. Appoint Supervisors under the OHSA. Appoint operators of moving machines under the OHSA – Driven machine regulation. Get nominees for Safety reps from all employees and have an election and done the appointments after the election. See that all employees that is appointed have the correct training and all operators have a valid license to operate. Compiling of a level 4 project plan on MS Projects for the complete project.
Compile method statement for the erection of all structures, conveyors and installation of mechanical equipment as per erection drawings, part by mark list and bolt list.
Help with the compiling of Risk Assessments for all tasks. With the help of the Rigger team compiling rigging studies for all heavy and complex lifts.
Compiling of daily reports on work performed the previous day. Month end reports of all work done. Be part of the cold and hot commissioning team to complete the project. Achieved 8 000 000 LTI free hours.